mer, 04/08/2026 - 16:02 par Anonymous

Added corresponding PDF as to this new update for Aug 14 2020 issue for berm repair failure

Ceci est la révision publiée.
lun, 08/24/2020 - 13:10 par HamiltonCSR

Additional information about the Berm repair was added to the additional information. Upon repair Berm was flushed to test and it was found to still be leaking resulted in 500,000 material filled water to pass through a sewage lagoon.

ven, 08/14/2020 - 10:49 par HamiltonCSR
ven, 08/14/2020 - 09:48 par HamiltonCSR

Nunavut Excavating, who constructed the berm cell and had attempted to repair the leaky berm, took water from a nearby water source and pumped it into the sewage lagoon cell to see if the repair attempt had been successful. However, the berm is still leaking so it is expected that the estimated 500,000 litres of water that was pumped into the sewage lagoon cell. *Perhaps the term "sewage" isn't the correct terminology - the material filled is water that has passed through a sewage lagoon.

ven, 08/14/2020 - 09:48 par HamiltonCSR

Nunavut Excavating, who constructed the berm cell and had attempted to repair the leaky berm, took water from a nearby water source and pumped it into the sewage lagoon cell to see if the repair attempt had been successful. However, the berm is still leaking so it is expected that the estimated 500,000 litres of water that was pumped into the sewage lagoon cell. *Perhaps the term "sewage" isn't the correct terminology - the material filled is water that has passed through a sewage lagoon.

mar, 06/30/2020 - 11:27 par station

Attached are two maps showing where the spill originates and the directions of the flow Also, I was just advised that the contractors that are to repair the berm are in the community and will be wanting to decant the remainder of the contents of the damaged cell. I would assume that they are required to fill out a form to send to you regarding the decanting as opposed to the spill. Louis M. Primeau, B.Comm., CPA-CMA, CPA-CGA Chief Administrative Officer / Director of Finance Hamlet of Sanirajak P.O. Box 198 Sanirajak, NU X0A OK0 P: (867) 928-8829 F: (867) 928-8871 C: (867) 222-9933 E1: sao_hbhamlet@qiniq.com E2: dfn_hbhamlet@qiniq.com

mar, 06/30/2020 - 09:12 par station

Subsequent to the filing of the spill report yesterday, the Foreman advised that the sewage lagoon cell that is leaking was not used this year until April 12th. Water deliveries from then to June 26th are estimated to be 7,843,869 litres as noted on the revised report Louis M. Primeau, B.Comm., CPA-CMA, CPA-CGA Chief Administrative Officer / Director of Finance Hamlet of Sanirajak P.O. Box 198 Sanirajak, NU X0A OK0 P: (867) 928-8829 F: (867) 928-8871 C: (867) 222-9933 E1: sao_hbhamlet@qiniq.com E2: dfn_hbhamlet@qiniq.com INAC: 06.20.2020 09:11 notified Justin Hack

mar, 06/30/2020 - 08:25 par snoble

Lead agency changed from GN to INAC as INAC legislation covers water licences. INAC notified of change.

lun, 06/29/2020 - 09:12 par station

GN: 06.29.2020 09:10 notified Sean Noble