J. Michael Miltenberger – Report on the Northwest Territories Power Corporation
Mr. Speaker, it has been a challenging summer for the Northwest Territories Power Corporation. During this past summer the Taltson hydroelectric plant and the transmission lines between the Snare plants and Yellowknife were threatened by forest fires. Fortunately, all major infrastructure was preserved however, these same fires were responsible for half of the power outages experienced on the Snare system.