We’re moving. Please go to GNWT.ca for all GNWT programs, services and information.

Revisions for spill-2020365

Primary tabs

RevisionOperations
Wed, 04/08/2026 - 16:02 by Anonymous

The spill was below the reportable limits considered for a spill under the NT/NU Spills Working Group Agreement. The inspector is satisfied with the mitigation measures applied to spills at the site.

This is the published revision.
Tue, 09/29/2020 - 10:04 by Donald_Roberts

uploaded missing images

Tue, 09/29/2020 - 10:00 by Donald_Roberts

Corrected Lead Agency to CIRNAC as the facility is authorized by a water licence. and corrected location to Pond Inlet.

Tue, 09/29/2020 - 08:48 by HamiltonCSR

For further information on specific spill files, please email:

Please include the spill number(s) in your inquiry.