Revisions for spill-2021285

Primary tabs

RevisionOperations
Wed, 04/08/2026 - 16:02 by Anonymous

Supporting document and additional information added by ECCC NEEC BS Update added 2021-07-16: • Do you have an estimate of the volume released? The flow at the time was ~7 L/s • Could you provide the lab results for the June 17th samples? Attached. • Could you provide the daily report for June 17th? Attached. • What is the reason this was not reported until July 7th? This was immediately the plug failure, and related. Also, it was a site sample result at the time, not lab. I realize now it should have been reported at the time. From previous conversations, I am aware that no acute lethality samples were taken but I would still like to reiterate the importance of taking acute lethality samples when incidents of this nature occur as it is the best way of proving compliance with the Fisheries Act and of showing diligence on behalf of the company. Agreed. We will instruct water techs to take a 3-5 sample for toxicity testing if site readings exceed EQC.

This is the published revision.
Wed, 07/07/2021 - 13:30 by ec.cnue-neec.ec

Spill report corrected by ECCC NEEC LTa: The "Spill Location Description" was corrected to indicate "Longitude" for the longitude coordinates (the longitude coordinates were erroneously indicated as the latitude).

Wed, 07/07/2021 - 13:19 by ec.cnue-neec.ec

Spill report created by ECCC NEEC LTa

For further information about this specific spill file, please email spills@gov.nt.ca. Please include the spill number in your inquiry