Revisions for spill-2022531

Primary tabs

RevisionOperations
Fri, 05/03/2024 - 16:34 by lila_voudrach
This is the published revision.
Fri, 05/03/2024 - 16:33 by lila_voudrach

Inspector Lila VOUDRACH conducted a final inspection on September 14, 2023. All contaminated soil has been contained in KBL mega bags, and the waste fuel was transferred into a 45 ga drum. The responsible party disposed of the contaminated soil by bringing it to the KBL treatment site at the Inuvik Solid Waste Site. File closed.

Fri, 06/16/2023 - 16:24 by Anonymous
Fri, 11/18/2022 - 09:06 by Benjamin_Elkin
Thu, 11/17/2022 - 16:30 by ec.cnue-neec.ec