Fri, 05/03/2024 - 16:33 by lila_voudrach Inspector Lila VOUDRACH conducted a final inspection on September 14, 2023. All contaminated soil has been contained in KBL mega bags, and the waste fuel was transferred into a 45 ga drum. The responsible party disposed of the contaminated soil by bringing it to the KBL treatment site at the Inuvik Solid Waste Site. File closed. |
|
| | |